Mövenpick Hotel Jollie Ville Pyramids, Egypt
Client
Mövenpick Hotels and Resorts
Contractor
Tepe Prefabrik
Location
Cairo, Egypt
Completion Date
1990
Description
A resort 5 star hotel of 528 beds capacity, with FF&E, infrastructure and landscaping, constructed in light prefabrication system. All the prefabricated components were manufactured in Turkey, transported to Egypt and assembled on site, on a turnkey basis.